2023
Richfield, UT
Concrete Cutting / Highway and Airport Services / Demolition / Concrete Pouring / Transportation
Interstate 70 and State Road 120 – Richfield, Utah
A-Core in partnership with UDOT is performing pavement restoration on Interstate 70 from Richfield to Joseph, Utah, and State Road 120 from 640 North to 1300 South in Richfield, Utah. The concrete panels that have cracked, sunk, or show other signs of corrosion, will be replaced. This method of replacing individual panels is a cost-effective way to maintain the safety and integrity of the road. 483 panels will be replaced. Lane restrictions will be in effect for both east and west lanes bounds on Interstate 70 and north and south bound lanes on State Road 120 in Richfield
We'll get right back to you
Send us the details and our team will reach out within a few business days.